Past consultations for the New Dacorum Local Plan

Emerging Strategy for Growth consultation 2020 

In 2020, we asked you to have your say on our Emerging Strategy for Growth, a draft Local Plan. This was our previous phase of plan preparation and included sites proposed at that time and draft policies to deliver these and control other development within the borough. Our video for the consultation explains more:

    

Our consultation on the Emerging Strategy for Growth stage of the Local Plan took place between November 2020 and February 2021. 

We have prepared a Consultation Summary Report (see Summary report and Appendices below) on the key issues raised and recommendations to take forward.

 Appendix 1 - Emerging Strategy Consultation Summary Report (PDF 5.8MB)
 Consultation Summary Report - Appendix 2a - Consultation points 3 to 5 (PDF 12MB)
 Consultation Summary Report - Appendix 2b - Consultation points 6 to 12 (PDF 9MB)
 Consultation Summary Report - Appendix 2c - Consultation points 14 to 22 (PDF 11MB)
 Consultation Summary Report - Appendix 2d - Consultation point 23 - All Settlement Delivery Strategies (PDF 11MB)
 Consultation Summary Report - Appendix 2e - Consultation point 24 - Hemel Hempstead and Berkhamsted Proposals and Sites (PDF 8MB)
 Consultation Summary Report - Appendix 2f - Consultation point 24 - Tring to Countryside Proposals and Sites (PDF 10MB)
 Consultation Summary Report - Appendix 2g - Consultation points 25 to 28 (PDF 12MB)

Dacorum Local Plan (2020-2038) Emerging Strategy for Growth documents

Part 1 - Local Plan Emerging Strategy for Growth 2020-2038 - pages 1 to 187 (PDF 8MB)
 Part 2 - Local Plan Emerging Strategy for Growth 2020-2038 - pages 188 to 261 (PDF 4MB)
 Part 3 - Local Plan Emerging Strategy for Growth 2020-2038 - pages 262 to 297 (PDF 11MB)
 Part 4 - Local Plan Emerging Strategy for Growth 2020-2038 - pages 298 to 359 (PDF 11MB)
 Local Plan Emerging Strategy for Growth 2020-2038 Draft Proposals Map (PDF 9MB)

Sustainability Appraisal documents

 Dacorum Local Plan Interim Sustainability Appraisal Report - November 2020 (PDF 2MB)
 Dacorum Local Plan Interim Sustainability Appraisal Report Appendices - November 2020 (PDF 4MB)
 Dacorum Local Plan Interim Sustainability Appraisal Report - Non-Technical Summary - November 2020 (PDF 1MB)

Other supporting consultation documents

 Local Plan Emerging Strategy for Growth 2020-2038 - Summary Document (PDF 4MB) 
 Local Plan Emerging Strategy for Growth Consultation FAQs and Supporting Information (PDF 10MB)

Issues and Options document consultation November 2017

In November 2017, extensive public consultation was carried out on the Issues and Options document - this looked at the challenges the borough faces to 2036, and options for how these could be addressed. A draft Sustainability Appraisal Working Note, which assessed the potential social, economic and environmental implications of the issues and options put forward, was also published for comment. Find out more about the Issue and Options consultation.

How we’ve been developing our Local Plan

The Plan has been informed by evidence and technical studies. For more details, please visit our evidence base work for the new single Local Plan.

 

Page Last Updated: Monday, 30 October 2023 at 03:45 PM